Bathroom Remodeling in Hancock Park
Serving 90004 · 90020 · 90019 · 90036 and Larchmont Village, Windsor Square, Miracle Mile
Period-revival houses in Hancock Park were generous with reception rooms and mean with bathrooms, because a second one was a luxury when they were drawn. The usual brief is therefore not "make it beautiful" but "find the space" — and on lots and plans this size the space is almost always there once somebody is willing to redraw a whole floor at once.
Real projects. Real prices.
77 finished remodels published with their final price — nothing hidden.
What 30 finished LA bathrooms actually cost: a median of $38k, in a range of $28k–$105k. Real final prices from our own job records, not estimates.
$30,000 A full-length double vanity under twin lit mirrors, with herringbone mosaic shower niches.
$33,000 A backlit mirror over a double vanity, with stone-look tile and matte black fittings throughout.
$35,000 A freestanding oval tub under an arched window, against a band of blue lantern tile and marble-look walls.
$42,000 One bathroom in sea-green subway tile with a concrete-look floating vanity, and a second in a white textured tile with a shaker vanity.
$43,000 A curbless walk-in shower with a built-in bench, in large-format stone-look tile with a split-face stone band.
$95,000 Two glazed-tile showers, one olive and one aqua, with brass fittings and taupe shaker vanities.
Bathrooms in houses built with one of them
Borrow from the landing, the closet or the back bedroom
Adding a bathroom or enlarging one means taking area from something adjacent. Done on a drawing of the entire floor it works; done one room at a time it produces a door that opens into a basin.
Original tile: some of it is worth keeping
A proportion of the original bathroom tilework in these houses is genuinely good and cannot be replaced. A larger proportion is from a much later decade and is worth nothing. Sorting the two before demolition day occasionally saves the best surface in the house.
A hundred years of plumbing above a finished ceiling
Old waste runs, no vent where a modern layout wants one, and a ceiling underneath that somebody has already repaired once. We open it and look before pricing, because the alternative is arithmetic performed on a guess.
Written by Onn Cohen-Meguri, founder and designer at Design Onn Point — 12+ years in business, 1,200+ finished Los Angeles projects. CSLB #1133368.
Pricing in Hancock Park
From our completed projects.
Talk to Onn about your Hancock Park bathroom remodeling.
Free consult, no obligation. Onn reads every inquiry personally — and aims to reply within one business day.
From the blog
Hidden Costs in Kitchen Remodels (How to Avoid Them)
The 8 most common surprise expenses in LA kitchen remodels — older wiring, plumbing surprises, structural finds — and how we budget for them.
LA County Kitchen Permits Explained (2026 Edition)
When you need a permit for an LA kitchen remodel, how LADBS plan-check works, typical timelines, and how to avoid the common mistakes.