Bathroom Remodeling in Huntington Beach
Serving 92646 · 92647 · 92648 · 92649 and Costa Mesa, Fountain Valley, Westminster
Tract bathrooms are small, and small is unforgiving. There is rarely spare width to move a fixture, which means most of the gain comes from what you can do inside the existing footprint — better storage, a larger shower where the tub was, ventilation that actually works. The projects that disappoint are the ones sold on a layout the room cannot physically support.
Real projects. Real prices.
73 finished remodels published with their final price — nothing hidden.
What 28 finished LA bathrooms actually cost: a median of $38k, in a range of $28k–$105k. Real final prices from our own job records, not estimates.
$30,000 A full-length double vanity under twin lit mirrors, with herringbone mosaic shower niches.
$30,000 An emerald herringbone shower behind glass, with brass fittings and a walnut double vanity.
$33,000 A backlit mirror over a double vanity, with stone-look tile and matte black fittings throughout.
$35,000 A patterned encaustic-look floor, a sage shaker vanity and a glass shower with a tiled bench.
$46,000 One room in bold geometric tile with an oak vanity, one in white with a ribbed vanity and stone basin.
$105,000 Marble-veined slab walls, a frameless glass shower, and patterned tile floors.
Small footprints, salt air, honest scope
Working inside the walls you have
In a 5-by-8 bathroom the layout is largely set by where the drain and the door are. Real improvement comes from fixture selection, storage design and light rather than from moving plumbing that has nowhere better to go.
Extraction near the coast
Humid air and salt air together are hard on a small room. Ventilation gets sized and routed at design stage, because retrofitting it around finished tile is expensive and usually compromised.
Where the coastal zone reaches
Huntington Beach's coastal zone extends further inland than many owners assume and is divided into specific plan areas, six of the eight certified by the Coastal Commission. An interior bathroom rarely triggers coastal review, but the address is worth checking rather than assuming.
Written by Onn Cohen-Meguri, founder and designer at Design Onn Point — 12+ years in business, 1,200+ finished Los Angeles projects. CSLB #1133368.
Pricing in Huntington Beach
From our completed projects.
Talk to Onn about your Huntington Beach bathroom remodeling.
Free consult, no obligation. Onn reads every inquiry personally — and aims to reply within one business day.
From the blog
Hidden Costs in Kitchen Remodels (How to Avoid Them)
The 8 most common surprise expenses in LA kitchen remodels — older wiring, plumbing surprises, structural finds — and how we budget for them.
LA County Kitchen Permits Explained (2026 Edition)
When you need a permit for an LA kitchen remodel, how LADBS plan-check works, typical timelines, and how to avoid the common mistakes.